Subscribe floating btn

GE Vernova To Supply 15 Wind Turbines For Spanish Project

1 minute(s) Read

GE Vernova's 6MW wind turbine (Image courtesy of GE Vernova)

GE Vernova Inc. (GE Vernova) has reached an agreement with developer Renovalia to supply 15 wind turbines for the Santa Maria de las Fuentes wind farm in Spain. The contract, which was finalized in the fourth quarter of 2025, specifies the delivery of 6.1 MW-518-foot (158m) units for the site. This installation supports Spain’s national energy objectives, including a target of 62 GW of wind capacity by 2030 as part of a broader government plan to derive more than 80% of the country’s electricity from renewable sources by the end of the decade.

GE Vernova currently accounts for approximately 6 GW of Spain’s total wind capacity and maintains a significant industrial presence in the region. The company operates manufacturing facilities in Toledo, Ponferrada, and Castellón, alongside an engineering center of excellence located in Barcelona. These sites collectively support the company’s operations within the broader European wind market.

Globally, GE Vernova’s wind segment maintains an installed base of approximately 59,000 turbines, representing over 120 GW of capacity. The Santa Maria de las Fuentes project utilizes the company’s 6.1 MW platform, which is already deployed at several other wind farm sites across Spain to meet rising energy demand and regional decarbonization targets.

Share This Article

Related Articles

Grid Viability Over Vanity

964
Read Article

RWE, KKR Close US$15.9 Billion Deal For 2.8 GW Of UK Offshore Wind

958
Read Article

GE Vernova Lands Sixth Wind Order From Stadtwerke Heidenheim

1341
Read Article

Continue Reading