Subscribe floating btn

Anaergia Signs First Capwatt Contract

Italy Biogas Plant To Begin Operation In June 2026

1 minute(s) Read

(Image courtesy of Capwatt)

Anaergia Inc. has entered a contract with Capwatt Biomethane Unipessoal Lda (Capwatt) to design and construct Metanext, a biogas plant in central Italy. Expected to begin operation in June 2026, Metanext will produce 267 million ft.3 (7.6 million m3) of high-quality biomethane annually from agro-industry waste.

This contract follows the binding letter of intent (LOI) with Capwatt on April 21, 2025, for a total of nine projects expected to be completed over 30 months. Anaergia will oversee the design of each facility, incorporating advanced processes and proprietary systems such as anaerobic digesters, significantly enhancing Europe’s green energy infrastructure and accelerating biomethane production. The Metanext project represents the first of these nine projects.

Capwatt is a multinational group specializing in sustainable energy solutions. With a portfolio of bioenergy projects, Capwatt currently operates in Portugal, Spain, Italy, and Mexico.

Headquartered in Ontario, Canada, Anaergia is a technology company in the renewable natural gas (RNG) sector with over 250 patents dedicated to converting organic waste into sustainable solutions such as RNG, fertilizer, and water.

Share This Article

Related Articles

Turning Yogurt Into Energy

330
Read Article

EFRC Member Spotlight: TNO

776
Read Article

Clean Energy Cashes In On Dairy RNG With US$30.7 Million Tax Credit Sale

659
Read Article

Continue Reading