Subscribe floating btn

IHI Power Spearheads Operations, Maintenance, And Asset Management Needs For CE+P’s Sugar Valley Energy Campus

2 minute(s) Read

In March, Sugar Valley Energy LLC (SVE) chose IHI Power Services Corp. (IPSC) to provide operations and asset management for its ethanol biorefinery, bioelectric generation plant, and wastewater treatment facility which will be constructed on a 160-acre (65-ha) campus outside of Brawley, California. The 15-year operations and maintenance (O&M) agreement went into effect immediately as the facility prepared to begin construction. On August 25, IPSC announced it has deepened its partnership with California Ethanol and Power (CE+P), the development company for SVE, via a 15-year asset management deal to oversee its forthcoming SVE campus. The project is expected to produce approximately 70 million gallons of extremely low-carbon, fuel-grade Essential Ethanol from locally grown sugarcane; up to 49 MW of baseload electricity produced from biomass; and 737 Mscf of pipeline quality biomethane. Now, CE+P believes that its portfolio, proven track record of success, and full range of O&M services positions it to make a strategic decision to add asset management services to IPSC’s project scope.

“IPSC is dedicated to offering value-added services that ensure power plants and energy generation facilities run safely, reliably, and cost-effectively,” said John Keller, chief operating officer at IPSC. “We are proud to be flexing a number of our power facility management capabilities for the new SVE campus and are eager to continue to deepen this truly aligned partnership with the team at CE+P.”

“SVE is a part of a multibillion-dollar wave of new energy investment taking place in California and particularly in the Imperial Valley, adding resilience to our state’s energy portfolio and creating thousands of jobs,” said CE+P President and CEO Dave Rubenstein. “IPSC’s experience, vision, and commitment to sourcing employment in the Valley provide significant confidence that SVE will deliver on its promise for the region.”

The completed SVE campus will support an estimated 200 permanent new jobs onsite and in the Imperial County community, as well as hundreds of agriculture-related jobs associated with cultivating sugarcane. Construction of the facility alone is estimated to support more than 9000 jobs in various trades. The project represents a US$1 billion investment in the Imperial Valley region.

Share This Article

Related Articles

TotalEnergies To Produce Green Hydrogen At La Mède

17442
Read Article

Centrica Expands Green Power Portfolio

2359
Read Article

European Energy Increases Green Hydrogen Footprint

10632
Read Article

Continue Reading